What a working bid packet should include.

The Bid Packet is the pricing handoff: enough structure to understand the work, start vendor and subcontractor conversations, and document assumptions before the proposal draft. This one was built from a public advertisement for bids from Otter Tail County HRA for a single-family rehab in Fergus Falls, MN.

BSample Bid PacketREADY
DOCProject Summary
XLSMaterials Checklist
DOCProposal Draft

From document mess to pricing-ready sections.

The packet turns the owner documents into a more usable sequence: summary, scope, materials, assumptions, exclusions, and next steps.

SUM

Summary

The same first-pass read from the RFP Summary tier.

SCOPE

Scope breakdown

Work grouped by category and trade for review.

XLS

Materials checklist

Excel output for document-supported materials and specs.

NOTE

Assumptions and exclusions

Starting boundaries to verify before pricing.

Use it before final estimating.

This packet is built for the point where the job looks real, but the team still needs a clean handoff before pricing.

Organize the scope before estimating.
Prepare subcontractor or supplier questions.
Build a materials review list.
Capture exclusions before they are forgotten.

Download the sample packet.

Both documents from the sample, exactly as they come out of the packet, with the street address and the county’s parcel reference taken out and every price cell left for you.

Prices read UNPRICED: the packet drafts the scope, you set the numbers.

Source: Otter Tail County HRA, advertisement for bids dated May 5, 2026 (single-family rehabilitation, Fergus Falls, MN; bids due May 26, 2026), a public county document. The street address and parcel reference are withheld here; the document’s SHA-256 is given under “How this sample was made” so a copy obtained from the county can be matched.

Read the packet before you download it.

The excerpts below are read straight out of the two documents linked above — same wording, same figures, same guardrail lines. It is a real packet, built from a public document by one analysis pass, with the street address and the county's parcel reference taken out.

How this sample was made

Otter Tail County HRA — single-family rehab, Fergus Falls, MN

The source is a public advertisement for bids from Otter Tail County HRA. It was read once, and the RFP Summary, the Bid Packet and the Proposal Packet were all drafted from that one reading, so the three samples describe the same job in the same words.

Source: a public Otter Tail County HRA advertisement for bids (18 pages, retrieved 2026-10-13), sha256 9f284a2ef3e0780be44e4697db3a3d1cc94b62dfd077b7f7646eabd7e332e2e6. All 18 pages were read. Models: claude-opus-4-8, claude-sonnet-4-6. Generated from commit 6822533 with one analysis pass and one drafting pass.

Summary — the opening read

Project Summary — Otter Tail County HRA — single-family rehab, Fergus Falls, MN

This is a full gut-rehabilitation of a single-story ranch home with an attached garage in Fergus Falls, Minnesota, owned by Otter Tail County HRA. We're touching everything — exterior envelope, roofing, siding, windows, doors, concrete flatwork, foundation grading, and a complete interior rehab including plumbing, electrical, mechanical, insulation, drywall, flooring, and paint. It's a top-to-bottom rebuild of a tax-forfeit property to bring it up to current code and make it livable again.

Scope breakdown by trade

Work grouped the way it gets priced.

  • Site Work & Demolition
  • Chimney Demolition & Patching
  • Concrete Flatwork
  • Framing & Structural Carpentry
  • Roofing
  • Siding, Soffit, Fascia & Exterior Trim
  • Insulation
  • Windows & Egress
  • Exterior Doors
  • Interior Doors
  • Drywall & Plaster
  • Interior Paint & Finishes

20 trades in the full packet, 12 shown here.

Materials checklist

The line items, with the price column left to you.

MATERIALS CHECKLIST — NOT A COMPLETE ESTIMATE OR BID. 227 of 227 line items are unpriced and excluded from the subtotal, including major scope (Electrical, Plumbing, Concrete Flatwork, Mechanical (HVAC), and 16 more categories). Verify every quantity and price before bidding.
ItemDescriptionQtyUnitUnit price
Tree removal (near/into foundation)Remove all trees growing near or into foundation; grub roots1LSUNPRICED — add your price
Loam topsoilGrade for 1:4 positive drainage, 4' from foundation all sides1LSUNPRICED — add your price
Grass seed mixSeed all new/disturbed areas around foundation1LSUNPRICED — add your price
Erosion control / straw blanketInferred — verify before bidding Temporary erosion control over seeded areas1LSUNPRICED — add your price
Foundation assessment & repairAssess existing foundation condition; repair as necessary (allowance)1LSUNPRICED — add your price
Concrete demolition — driveway slabRemove existing concrete slab in front of garage; haul off site450SFUNPRICED — add your price
Concrete demolition — front sidewalkRemove existing front sidewalk to entry stair; haul off site120SFUNPRICED — add your price
Interior demolition — kitchenRemove fixtures, floor covering, cabinets, soffit, appliances, trim; disconnect utilities1LSUNPRICED — add your price
Interior demolition — main floor bathroomGut bath: remove fixtures, floor covering, trim1LSUNPRICED — add your price
Interior demolition — basement bathroomGut basement bath: remove fixtures, wall/ceiling/floor covering; cap all lines; leave unfinished1LSUNPRICED — add your price
Wall removal — entry/kitchen partial wallRemove approx. 18" from existing entry/kitchen wall (field verify with owner on site)1LSUNPRICED — add your price
Wall removal — dining/living room partitionRemove wall separating dining room and living room (field verify with owner on site)1LSUNPRICED — add your price

Subtotal — priced materials only (NOT a project total or bid)

227 line items in the file, 12 shown. Every one carries the same UNPRICED — add your price tag, because the packet never invents a price.

Need to Confirm / Verify Before Bidding

What the packet refuses to guess at.

  • Permit jurisdiction — verify before bidding (source documents do not explicitly name the permitting authority)
  • Lead Risk Assessment status — confirm whether a formal assessment has been done and whether any items are flagged as exceeding lead paint thresholds, which triggers licensed lead supervisor/worker requirements
  • Owner to meet on site before demo: confirm exact scope of entry/kitchen wall removal (~18") and dining/living room wall removal
  • Owner to confirm interior paint colors, exterior door paint colors, and all other owner-selected finishes before work begins
  • Owner to confirm final shingle color and manufacturer selection

5 of 12 shown — the summary document carries the rest.

Questions for the client

Raised while reading the plan set.

  • What is the project budget range / are there funding caps for the rehab program?
  • Confirm paint colors for interior, exterior doors, and other owner-selected finishes
  • Confirm final shingle color and manufacturer selection
  • Confirm LVP flooring type, manufacturer, and style selection
  • Owner to meet on site to discuss entry/kitchen wall (~18" removal) and dining/living room wall removal

5 of 9 shown.

Preview your own job free.

Upload the plans or RFP. Read the preview. Pay only if the packet is useful.

Upload your RFPFree preview · No credit card · No subscription