What the full proposal packet adds.
The Proposal Packet carries the organized bid-prep work into an editable Word proposal draft. It is a starting point for contractor review, not a document to send as it stands. This one was built from a public advertisement for bids from Otter Tail County HRA for a single-family rehab in Fergus Falls, MN.
The packet plus a draft you can revise.
The proposal draft uses the same scope and assumptions as the rest of the packet, so the client-facing language starts from the same source. The dollar amounts in it are the one place a packet shows numbers, and each one is labeled as a draft.
Project summary
The same read as the RFP Summary: the job, the dates, and what to confirm.
Materials checklist
Every line unpriced and every price left to you, with labor kept out of the subtotal.
Word proposal draft
Scope, inclusions, exclusions, a payment schedule and a signature block, in editable Word.
Placeholders, not inventions
Warranty and company name stay placeholders until you fill them in.
Finish it like a contractor, not like a template.
The draft should be checked against your price, your contract language, your schedule, and the owner’s bid instructions before it goes anywhere.
Download the sample Proposal Packet.
All three documents, exactly as they come out of the packet, with the street address and the county’s parcel reference taken out. Edit them in Word and Excel like any other file.
Every dollar in the proposal is labeled DRAFT ESTIMATE, and the checklist prices read UNPRICED.Source: Otter Tail County HRA, advertisement for bids dated May 5, 2026 (single-family rehabilitation, Fergus Falls, MN; bids due May 26, 2026), a public county document. The street address and parcel reference are withheld here; the document’s SHA-256 is given under “How this sample was made” so a copy obtained from the county can be matched.
Read the packet before you download it.
The excerpts below are read straight out of the three documents linked above — same wording, same figures, same guardrail lines. It is a real packet, built from a public document by one analysis pass, with the street address and the county's parcel reference taken out.
Otter Tail County HRA — single-family rehab, Fergus Falls, MN
The source is a public advertisement for bids from Otter Tail County HRA. It was read once, and the RFP Summary, the Bid Packet and the Proposal Packet were all drafted from that one reading, so the three samples describe the same job in the same words.
Project Summary — Otter Tail County HRA — single-family rehab, Fergus Falls, MN
This is a full gut-rehabilitation of a single-story ranch home with an attached garage in Fergus Falls, Minnesota, owned by Otter Tail County HRA. We're touching everything — exterior envelope, roofing, siding, windows, doors, concrete flatwork, foundation grading, and a complete interior rehab including plumbing, electrical, mechanical, insulation, drywall, flooring, and paint. It's a top-to-bottom rebuild of a tax-forfeit property to bring it up to current code and make it livable again.
Work grouped the way it gets priced.
- Site Work & Demolition
- Chimney Demolition & Patching
- Concrete Flatwork
- Framing & Structural Carpentry
- Roofing
- Siding, Soffit, Fascia & Exterior Trim
- Insulation
- Windows & Egress
- Exterior Doors
- Interior Doors
- Drywall & Plaster
- Interior Paint & Finishes
The line items, with the price column left to you.
MATERIALS CHECKLIST — NOT A COMPLETE ESTIMATE OR BID. 227 of 227 line items are unpriced and excluded from the subtotal, including major scope (Electrical, Plumbing, Concrete Flatwork, Mechanical (HVAC), and 16 more categories). Verify every quantity and price before bidding.| Item | Description | Qty | Unit | Unit price |
|---|---|---|---|---|
| Tree removal (near/into foundation) | Remove all trees growing near or into foundation; grub roots | 1 | LS | UNPRICED — add your price |
| Loam topsoil | Grade for 1:4 positive drainage, 4' from foundation all sides | 1 | LS | UNPRICED — add your price |
| Grass seed mix | Seed all new/disturbed areas around foundation | 1 | LS | UNPRICED — add your price |
| Erosion control / straw blanket | Inferred — verify before bidding Temporary erosion control over seeded areas | 1 | LS | UNPRICED — add your price |
| Foundation assessment & repair | Assess existing foundation condition; repair as necessary (allowance) | 1 | LS | UNPRICED — add your price |
| Concrete demolition — driveway slab | Remove existing concrete slab in front of garage; haul off site | 450 | SF | UNPRICED — add your price |
| Concrete demolition — front sidewalk | Remove existing front sidewalk to entry stair; haul off site | 120 | SF | UNPRICED — add your price |
| Interior demolition — kitchen | Remove fixtures, floor covering, cabinets, soffit, appliances, trim; disconnect utilities | 1 | LS | UNPRICED — add your price |
| Interior demolition — main floor bathroom | Gut bath: remove fixtures, floor covering, trim | 1 | LS | UNPRICED — add your price |
| Interior demolition — basement bathroom | Gut basement bath: remove fixtures, wall/ceiling/floor covering; cap all lines; leave unfinished | 1 | LS | UNPRICED — add your price |
| Wall removal — entry/kitchen partial wall | Remove approx. 18" from existing entry/kitchen wall (field verify with owner on site) | 1 | LS | UNPRICED — add your price |
| Wall removal — dining/living room partition | Remove wall separating dining room and living room (field verify with owner on site) | 1 | LS | UNPRICED — add your price |
Subtotal — priced materials only (NOT a project total or bid)
Construction Proposal — Single-Family Home Rehabilitation
DRAFT — for your review and editing. Not a final bid. Verify all scope, pricing, and terms before sending to a client.Full gut/rehab of tax-forfeit single-family ranch home in Fergus Falls, MN for the Otter Tail County CDA / HRA.
The scope, written as language a client can read.
- [Your Company Name] proposes to furnish all labor, materials, equipment, permits, and inspections necessary to complete the comprehensive rehabilitation of the existing single-family home in Fergus Falls, MN, as described in the Otter Tail County CDA/HRA Work Specifications and the following scope of work.
- Assess grading around the foundation; furnish and grade loam topsoil to achieve 1:4 positive drainage for 4 feet out from the foundation, and seed all new and disturbed areas with a grass seed mix.
- Assess the existing foundation condition and repair as necessary; remove all trees growing near or into the foundation.
- Tear down the unused chimney, cap it with masonry below the roof sheathing and terminate it at the attic floor, then frame and sheath the opening to match existing and haul all debris off site.
Every dollar labeled as a draft.
DRAFT ESTIMATE — these amounts are AI-drafted starting points, not quotes. Verify all pricing against your own costs and local market before sending.| Description | Amount (draft) |
|---|---|
| Site work — foundation grading, loam/seed, tree removal, foundation repair | $6,800 |
| Chimney removal, cap, frame and sheath opening | $3,200 |
| Concrete — driveway slab (~450 SF) and front sidewalk (~120 SF) | $7,500 |
| Roofing — strip and reroof with 30-yr architectural shingles | $11,500 |
| Siding — remove existing; new vinyl siding, accent wall, 2" foam board, trim/soffit/fascia | $18,500 |
| Attic insulation — remove loose-fill, install R-38, baffles, fixture protection | $2,900 |
| Attic/garage fire separation wall sheathing and access panel | $1,400 |
| Windows — Low-E argon vinyl replacements per schedule | $9,800 |
| Egress windows — convert 2 basement windows (excavation, foundation mods) | $6,500 |
| Exterior doors (3) and Andersen storm door | $4,800 |
| Interior swing doors (11, incl. fire-rated) and closet bypass doors (3) | $6,200 |
| Interior paint — all surfaces, built-ins | $7,200 |
| Plumbing total rehab (permitted; incl. WC, tub/shower, water heater allowances) | $16,500 |
| Electrical total rehab (permitted; incl. microwave allowance) and fixtures/switch | $13,500 |
| Mechanical total rehab — furnace, A/C, duct adaptation, seal, duct cleaning | $13,800 |
| Demolition — kitchen, interior walls, bath gut-outs, basement bath cap | $5,400 |
| Basement ceiling — 5/8" Type X gypsum (~1,200 SF), tape/finish to fire code | $4,600 |
| Flooring — remove carpet/vinyl, install floating LVP, base and thresholds | $8,900 |
| Exterior metal handrail/guardrail system | $2,400 |
| Gutters and downspouts — seamless, with splashblocks | $1,900 |
| Final cleaning, debris removal, permits/inspections coordination, connection charges | $3,700 |
| TOTAL (DRAFT) | $157,000 |
A payment structure to edit, not terms to accept.
- Contract execution / mobilization: $15,700 (10%)
- Exterior envelope complete (roofing, siding, windows, doors, concrete): $47,100 (30%)
- Mechanical, electrical, and plumbing rough-in complete and inspected: $47,100 (30%)
- Interior finishes complete (drywall, paint, flooring, fixtures): $31,400 (20%)
- Final inspection, cleaning, and project closeout: $15,700 (10%)
What is in, and what is deliberately out.
- All building, plumbing, and electrical permits
- Scheduling, coordination, and payment of all required inspections
- All sewer, water, and electrical connection charges
- Daily debris removal and broom sweep
- Owner-supplied fixtures (kitchen faucet, laundry tub, and living room ceiling fan, per spec)
- Finish selections not yet confirmed by owner (paint colors, shingle color/manufacturer, LVP style, handrail material/style)
- Work arising from undisclosed/unforeseen conditions beyond the documented scope (e.g., hidden structural, lead, or environmental conditions revealed after demolition)
- Lead Risk Assessment (assumed performed/furnished by owner)
Left for you to write.
[Your warranty terms — required before sending]What the packet refuses to guess at.
- Permit jurisdiction — verify before bidding (source documents do not explicitly name the permitting authority)
- Lead Risk Assessment status — confirm whether a formal assessment has been done and whether any items are flagged as exceeding lead paint thresholds, which triggers licensed lead supervisor/worker requirements
- Owner to meet on site before demo: confirm exact scope of entry/kitchen wall removal (~18") and dining/living room wall removal
- Owner to confirm interior paint colors, exterior door paint colors, and all other owner-selected finishes before work begins
- Owner to confirm final shingle color and manufacturer selection
Raised while reading the plan set.
- What is the project budget range / are there funding caps for the rehab program?
- Confirm paint colors for interior, exterior doors, and other owner-selected finishes
- Confirm final shingle color and manufacturer selection
- Confirm LVP flooring type, manufacturer, and style selection
- Owner to meet on site to discuss entry/kitchen wall (~18" removal) and dining/living room wall removal
Keep comparing your options.
Preview your own job free.
Upload the plans or RFP. Read the preview. Pay only if the packet is useful.
Upload your RFPFree preview · No credit card · No subscription