How to Review an RFP Before You Bid

Reviewing an RFP is not the same as reading it. Reading tells you what is on the page. Reviewing tells you whether the job is worth pursuing, what can disqualify the bid, and what still needs an answer before you price it.

A construction RFP review should leave you with three things: a list of the documents you reviewed, the requirements that could stop you bidding, and the questions that must be answered before pricing. This is the first review of the opportunity. When you are preparing the final submission, use the separate RFP response checklist.

What to record during the first review

Keep the source beside each finding. “Insurance required” is not enough to act on; record the exact requirement, the document and section where you found it, and who will confirm that your company can meet it.

Use these four statuses throughout the review:

Do not turn a missing item into an assumption just to fill a blank. Keep it open until someone resolves it.

Step 1: Confirm what you actually received

Start by listing every file and exhibit. Include drawings, specifications, bid forms, addenda, alternates, schedules, insurance requirements, bonds, and owner instructions. If the RFP references a document you do not have, that is your first question.

Read addenda early. They override earlier documents and often change deadlines, scope, or required forms. Reviewing the original package first and the addenda last is how teams price the wrong version of a job.

Record the revision or issue date beside each document. If an addendum replaces a sheet, mark the earlier sheet as superseded in your working list. If the package is unclear about which version applies, ask for clarification before pricing that work.

Step 2: Pull the submission rules

Before scope review, identify how the bid must be submitted. Look for:

These items should become a checklist immediately. They are easy to miss because they feel administrative, but they are often the difference between a responsive bid and a rejected package.

Step 3: Build the scope map

Now review the actual work. Group the scope by trade or category, then mark what is clearly included, excluded, by others, or uncertain. Use the drawings and written requirements together; one often clarifies or contradicts the other.

Do not solve every uncertainty during the first pass. Capture it. A clean list of questions is more useful than a quiet assumption nobody remembers making. The construction scope-of-work template gives you a structure for recording the scope once those boundaries are clear.

Step 4: Identify the risks

Risk is not just price. Look for phasing, occupied facilities, access constraints, schedule compression, long-lead materials, permit uncertainty, weather exposure, owner-furnished items, and unclear responsibility boundaries.

If a risk affects cost or schedule, it needs one of four outcomes: confirm it, price it, exclude it, or decide the job is not worth bidding.

Copyable RFP review worksheet

Download the printable review checklist (PDF)

Use this once per opportunity. Repeat the open-item block for every missing or conflicting requirement. “Not specified” records a gap; it does not mean the work is excluded.

Opportunity / project:
Reviewer and review date:
Documents reviewed, including revisions and addenda:
Referenced documents still missing:

Submission deadline and time zone:
Submission method and required forms:
Mandatory site visit or pre-bid meeting:
Qualification, insurance and bonding requirements to confirm:
Question deadline and owner contact, if specified:

Scope included in the documents:
Work assigned to others:
Schedule, access and long-lead items to confirm:

Open item:
Source document, page / section and revision:
Status: Confirmed / Missing / Conflicting / Needs confirmation
Question or next action:
Person responsible and follow-up date:

Decision: Bid / Clarify first / Pass
Reason and next action:

For an illustrative example, suppose a drawing calls for new doors but the written scope describes reusing the existing doors. Record both references, mark the item Conflicting, and ask which requirement applies. Do not silently choose the cheaper option or count both. Until the answer arrives, flag the affected quantity, price and schedule for confirmation.

Step 5: Make the go/no-go decision

The point of an RFP review is not to create a perfect estimate. It is to decide what happens next. After the first pass, you should know whether to:

Use the free bid/no-bid tool to weigh the opportunity against your capacity, qualifications and available bid time. It helps organize your judgment; it does not resolve the unanswered document questions.

BidPacket's RFP Summary helps with the scope review: a project overview, area-by-area descriptions where applicable, and items to confirm. It does not replace your deadline or submission checklist. See a sample RFP Summary before uploading, or add your RFP for a free preview. Verify the summary against the source documents, and keep final quantities, pricing, compliance and submission under your own review.

Collin Nicholas

I prep bids for a family construction business, and built BidPacket to take the reading and reassembly out of it.

More about who builds this, and why →

BidPacket turns your RFP and plan set into a project summary, scope breakdown, materials checklist, and proposal draft — with anything it can't confirm from your documents flagged for you.

Upload your RFP